[2020-01-05]

– Commenced the assembly work of 0.4km of heating and clean water lines on the exterior, 400m of heating and clean water pipes on the inside, and 148 pieces of heating equipment.

– The enclosed power supply substation was equipped with 10/0.4 kW 2 x 1600 kW transformers from Schneider Electric.