– Ordered 75,000 m3 air ventilation equipment for the auditorium from Carrier.
– 1200 cm diameter, 815 m long, 4 pipes for air ventilation were manufactured and assembled with 7,000 m2 of galvanized iron.
– Laid 25,100 m of network cables for alarm, Internet, and announcement systems, and installed 76 cameras inside and outside the structure.